HostDime Orlando Data Center
HostDime Orlando Data Center is an operational data center operated by HostDime in Orlando, United States. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | HostDime |
| Facility power | 10 MW (range 5.1 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,474 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 8 networks PeeringDB. |
| Also known as | HostDime |
| Address | 440 West Kennedy Blvd |
| Coordinates | 28.61753, -81.39338 |
| Website | hostdime.com/facilities/data-center |
Power and grid
| Utility | Reedy Creek Improvement Dist (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | FPC |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 8.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.1 °C (2001 to 2025) |
| Cooling degree days | 1,919 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does HostDime Orlando Data Center use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How clean is the power for HostDime Orlando Data Center?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates HostDime Orlando Data Center?
HostDime.
Data centers near Orlando
- Atlantic.net 62 m
- HostDime Orlando Tier IV Data Center 827 m
- Smart City Telecom Maitland Colo 2.4 km
- Colo Solutions Downtown Orlando 9.3 km
- E-Foam 17.3 km · 1 MW
- CoreSite - Orlando (OR1) 21.3 km
- Data center in Polk City 56.2 km · 3.3 MW
- ACW Winter Haven 73.7 km
More HostDime data centers
- HostDime BOG Colombia Tier IV Data Center Colombia
- HostDime GDL Mexico Data Center Mexico
- HostDime JPA Brazil DataCenter Brazil
- HostDime Orlando Tier IV Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.