HostDime BOG Colombia Tier IV Data Center
HostDime BOG Colombia Tier IV Data Center is an operational data center operated by HostDime in Bogota, Colombia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | HostDime |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Address | 1.5KM VIA BRICENO - ZIPAQUIRA - #9 |
| Coordinates | 5.01207, -73.99272 |
| Website | hostdime.com/colombia-data-center |
Power and grid
| Nearest high-voltage substation | Zipaquira, 115 kV, 1.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación Torca, 230 kV, 26.2 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 255 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 185 g CO₂ per kWh (Colombia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1% |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 23.7 °C (2001 to 2025) |
| Cooling degree days | 0 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.52 kWh per m² per day |
| Wind at 50 m | 2.7 m/s average |
| Water stress today | Low (<10%) (Cundinamarca) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is HostDime BOG Colombia Tier IV Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Zipaquira (115 kV), about 1.3 km away.
How clean is the power for HostDime BOG Colombia Tier IV Data Center?
The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.
Who operates HostDime BOG Colombia Tier IV Data Center?
HostDime.
Data centers near Bogota
- Cirion Bogota - BOG1 29.7 km · 12 MW
- Odata DC BG01 33.4 km
- Cirion Bogota - BOG2 34.9 km
- EdgeUno Datacenter Bogota Colombia (BOG4) 37.2 km
- Data center in Bogotá 37.8 km
- San Martin 38.3 km
- RENATA 39.1 km
- Bogotá - Barrio Colombia 40.0 km
More HostDime data centers
- HostDime Orlando Data Center United States
- HostDime GDL Mexico Data Center Mexico
- HostDime JPA Brazil DataCenter Brazil
- HostDime Orlando Tier IV Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.