Odata DC BG01
Odata DC BG01 is an operational data center operated by ODATA COLOMBIA in Cota, Colombia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | ODATA COLOMBIA |
| Networks | 22 networks, 1 internet exchanges PeeringDB. |
| Address | Zona Franca Metropolitana, Predio san Rafael, vereda vuelta grande, Cota, Cundinamarca |
| Coordinates | 4.75181, -74.14249 |
| Website | odatacolocation.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 2.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 5.2 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 1.1 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 185 g CO₂ per kWh (Colombia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1% |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 23.7 °C (2001 to 2025) |
| Cooling degree days | 0 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.52 kWh per m² per day |
| Wind at 50 m | 2.7 m/s average |
| Water stress today | Low (<10%) (Cundinamarca) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Odata DC BG01 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.6 km away.
How clean is the power for Odata DC BG01?
The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.
Who operates Odata DC BG01?
ODATA COLOMBIA.
Data centers near Cota
- Cirion Bogota - BOG2 7.3 km
- Cirion Bogota - BOG1 8.6 km · 12 MW
- KIO Data Centers BOG1 8.7 km · 2.3 MW
- Takoda BG01 9.0 km
- Equinix BG1 - Bogota 9.1 km
- Equinix BG2 9.2 km · 1.5 MW
- Data center in Bogotá 9.7 km
- IFX Datacenter WBP Bogota 11.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.