Equinix BG2
Equinix BG2 is an operational data center operated by Equinix in Kennedy, Colombia. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 1.5 MW (range 0.6 MW to 3.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,819 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 4.67101, -74.16141 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 2.8 km away (Enel) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 10.9 km away |
| HV substations within 10 km | 16 |
| Power plants within 50 km | 1.1 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 185 g CO₂ per kWh (Colombia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 25.6 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.31 kWh per m² per day |
| Wind at 50 m | 2.7 m/s average |
| Water stress today | Low (<10%) (Colombia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix BG2 use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
How close is Equinix BG2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.8 km away.
How clean is the power for Equinix BG2?
The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.
Who operates Equinix BG2?
Equinix.
Data centers near Kennedy
- Equinix BG1 - Bogota 598 m
- Takoda BG01 705 m
- KIO Data Centers BOG1 823 m · 2.3 MW
- IFX Datacenter WBP Bogota 6.2 km
- Data center in Bogotá 8.5 km
- Odata DC BG01 9.2 km
- Cirion Bogota - BOG2 9.3 km
- Bogotá - Barrio Colombia 10.6 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States