Bogotá - Barrio Colombia is an operational data center operated by S3WIRELESS COLOMBIA in Bogota, Colombia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorS3WIRELESS COLOMBIA
AddressCra 21 # 70a - 28
Coordinates4.65973, -74.06649
Websites3.com.co/smart-technology

Power and grid

Nearest high-voltage substationCalle 67, 115 kV, 600 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubcentral Circo, 230 kV, 8 km away
HV substations within 10 km22
Power plants within 50 km1.1 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity185 g CO₂ per kWh (Colombia, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1%

Climate and water

Average temperature15.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature25.6 °C (2001 to 2025)
Cooling degree days1 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.31 kWh per m² per day
Wind at 50 m2.7 m/s average
Water stress todayLow (<10%) (Colombia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Bogotá - Barrio Colombia to the power grid?

The nearest high-voltage substation in OpenStreetMap is Calle 67 (115 kV), about 600 m away.

How clean is the power for Bogotá - Barrio Colombia?

The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.

Who operates Bogotá - Barrio Colombia?

S3WIRELESS COLOMBIA.

Data centers near Bogota

More S3WIRELESS COLOMBIA data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.