KIO Data Centers BOG1
KIO Data Centers BOG1 is an operational data center in Kennedy, Colombia. Our footprint estimate of its power is about 2.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.3 MW (range 0.9 MW to 5.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 19,274 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 980 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 4.67490, -74.15509 |
Power and grid
| Nearest high-voltage substation | Subestación Eléctrica de Fontibon, 115 kV, 2.2 km away (Enel) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Noroeste, 230 kV, 11 km away |
| HV substations within 10 km | 16 |
| Power plants within 50 km | 1.1 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 185 g CO₂ per kWh (Colombia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 25.6 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.31 kWh per m² per day |
| Wind at 50 m | 2.7 m/s average |
| Water stress today | Low (<10%) (Colombia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does KIO Data Centers BOG1 use?
We estimate the facility power at about 2.3 MW. Estimate from building footprint, low confidence.
How close is KIO Data Centers BOG1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Eléctrica de Fontibon (115 kV), about 2.2 km away.
How clean is the power for KIO Data Centers BOG1?
The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.
Data centers near Kennedy
- Takoda BG01 327 m
- Equinix BG1 - Bogota 405 m
- Equinix BG2 823 m · 1.5 MW
- IFX Datacenter WBP Bogota 5.6 km
- Data center in Bogotá 7.7 km
- Cirion Bogota - BOG2 8.5 km
- Odata DC BG01 8.7 km
- San Martin 9.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.