Cirion Bogota - BOG1

Cirion Bogota - BOG1 is an operational data center operated by Cirion in Bogota, Colombia. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorCirion
Facility power12 MW (range 6.2 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,412 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks7 networks
PeeringDB.
AddressCarrera 68 #169A-73
Coordinates4.75494, -74.06462
Websiteciriontechnologies.com

Power and grid

Nearest high-voltage substationSubestación Cerros de Suba, 115 kV, 300 m away (Codensa)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestación Torca, 230 kV, 4.7 km away
HV substations within 10 km11
Power plants within 50 km1.1 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity185 g CO₂ per kWh (Colombia, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1%

Climate and water

Average temperature13.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature23.7 °C (2001 to 2025)
Cooling degree days0 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.52 kWh per m² per day
Wind at 50 m2.7 m/s average
Water stress todayLow (<10%) (Cundinamarca)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Cirion Bogota - BOG1 use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is Cirion Bogota - BOG1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Cerros de Suba (115 kV), about 300 m away.

How clean is the power for Cirion Bogota - BOG1?

The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.

Who operates Cirion Bogota - BOG1?

Cirion.

Data centers near Bogota

More Cirion data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.