Cirion Santiago de Chile - SAN1
Cirion Santiago de Chile - SAN1 is an operational data center operated by Cirion in Santiago, Chile. Our footprint estimate of its power is about 1.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Cirion |
| Facility power | 1.2 MW (range 0.6 MW to 1.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,004 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 510 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 70 networks, 4 internet exchanges PeeringDB. |
| Also known as | Adexus Santiago - CLink Extension · EdgeUno Datacenter Santiago Chile (SCL1) · Cirion |
| Address | Santa Marta de Huechuraba 6951, Huechuraba |
| Coordinates | -33.35799, -70.67626 |
| Website | ciriontechnologies.com |
Power and grid
| Nearest high-voltage substation | Subestación Quilicura, 110 kV, 2.6 km away (Enel Distribución Chile) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación El Salto, 220 kV, 4.4 km away |
| HV substations within 10 km | 13 |
| Power plants within 50 km | 1.2 GW in 83 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 445 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cirion Santiago de Chile - SAN1 use?
We estimate the facility power at about 1.2 MW. Estimate from building footprint, low confidence.
How close is Cirion Santiago de Chile - SAN1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Quilicura (110 kV), about 2.6 km away.
How clean is the power for Cirion Santiago de Chile - SAN1?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Who operates Cirion Santiago de Chile - SAN1?
Cirion.
Data centers near Santiago
- Google Data Center 1.7 km · 18 MW
- SONDA - Quilicura 2.1 km · 2.1 MW
- Microsoft Data Center 3.0 km · 11 MW
- Ascenty SCL02 - Santiago 3.5 km
- Ascenty SCL01 - Santiago 3.5 km
- GTD Chile - Panamericana 3.5 km
- Campus Santiago Ascenty Data Center 3.7 km · 11 MW
- Data Center GTD 4.4 km · 3.1 MW
More Cirion data centers
- Cirion Bogota - BOG1 Colombia
- Cirion Buenos Aires - BUE1 Argentina
- Cirion Bogota - BOG2 Colombia
- Cirion Cordoba - COR1 Argentina
- Cirion Curitiba - CUR1 Brazil
- Cirion Fortaleza Brazil
- Cirion La Urbina Venezuela
- Cirion Lima - LIM1 Peru