Microsoft Data Center
Microsoft Data Center is a data center under construction operated by Microsoft in Quilicura, Chile. Our footprint estimate of its power is about 11 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Under construction |
|---|---|
| Operator | Microsoft |
| Facility power | 11 MW (range 4.6 MW to 29 MW) Estimate from building footprint, low confidence. Footprint estimate: about 95,645 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | COLO 2 · COLO 1 |
| Address | Caupolicán 8680, Quilicura |
| Coordinates | -33.33814, -70.69743 |
Power and grid
| Nearest high-voltage substation | Subestación Quilicura, 110 kV, 3.7 km away (Enel Distribución Chile) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación El Salto, 220 kV, 6.8 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 1.0 GW in 83 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 445 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Data Center use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Quilicura (110 kV), about 3.7 km away.
How clean is the power for Microsoft Data Center?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Who operates Microsoft Data Center?
Microsoft.
Data centers near Quilicura
- Ascenty SCL02 - Santiago 705 m
- Ascenty SCL01 - Santiago 817 m
- Campus Santiago Ascenty Data Center 865 m · 11 MW
- SONDA - Quilicura 2.0 km · 2.1 MW
- Google Data Center 2.3 km · 18 MW
- Cirion Santiago de Chile - SAN1 3.0 km · 1.2 MW
- Odata Data Center 4.5 km · 5.3 MW
- EdgeConneX Santiago (EDCSCL01) 4.5 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.