EdgeConneX Santiago (EDCSCL01)
EdgeConneX Santiago (EDCSCL01) is an operational data center operated by EdgeConneX in Santiago, Chile. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Networks | 9 networks, 1 internet exchanges PeeringDB. |
| Also known as | EdgeConneX Santiago (EDCSCL02) |
| Address | Bodegas Megaflex, Carretera General San Martin 8400 |
| Coordinates | -33.29740, -70.70160 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Subestación Chicureo, 110 kV, 4.6 km away (Enel Distribución Chile) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación El Salto, 220 kV, 9.7 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 1.1 GW in 75 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 445 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeConneX Santiago (EDCSCL01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Chicureo (110 kV), about 4.6 km away.
How clean is the power for EdgeConneX Santiago (EDCSCL01)?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Who operates EdgeConneX Santiago (EDCSCL01)?
EdgeConneX.
Data centers near Santiago
- Odata Data Center 2.8 km · 5.3 MW
- Campus Santiago Ascenty Data Center 4.3 km · 11 MW
- Ascenty SCL02 - Santiago 4.4 km
- Microsoft Data Center 4.5 km · 11 MW
- Ascenty SCL01 - Santiago 4.6 km
- SONDA - Quilicura 6.6 km · 2.1 MW
- Google Data Center 6.8 km · 18 MW
- Datacenter Claro - Liray 6.9 km · 12 MW
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.