Ascenty SCL01 - Santiago
Ascenty SCL01 - Santiago is an operational data center operated by Ascenty DataCenters e Telecom in Santiago, Chile. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Ascenty DataCenters e Telecom |
| Networks | 26 networks, 2 internet exchanges PeeringDB. |
| Address | Guacolda 2100 - Comuna de Quilicura Region Metropolitana |
| Coordinates | -33.33854, -70.70621 |
| Website | ascenty.com/data-centers/chile/chile-1 |
Power and grid
| Nearest high-voltage substation | Subestación Quilicura, 110 kV, 3.7 km away (Enel Distribución Chile) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación El Salto, 220 kV, 7.6 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 1.0 GW in 84 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 445 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Ascenty SCL01 - Santiago to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Quilicura (110 kV), about 3.7 km away.
How clean is the power for Ascenty SCL01 - Santiago?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Who operates Ascenty SCL01 - Santiago?
Ascenty DataCenters e Telecom.
Data centers near Santiago
- Ascenty SCL02 - Santiago 179 m
- Campus Santiago Ascenty Data Center 293 m · 11 MW
- Microsoft Data Center 817 m · 11 MW
- SONDA - Quilicura 2.1 km · 2.1 MW
- Google Data Center 2.4 km · 18 MW
- Cirion Santiago de Chile - SAN1 3.5 km · 1.2 MW
- Odata Data Center 4.0 km · 5.3 MW
- EdgeConneX Santiago (EDCSCL01) 4.6 km
More Ascenty DataCenters e Telecom data centers
- Ascenty FTZ01 - Fortaleza Brazil
- Ascenty SPO01 - São Paulo Brazil
- Ascenty CPS01 - Campinas Brazil
- Ascenty HTL01 - Hortolândia Brazil
- Ascenty JDI01 - Jundiaí Brazil
- Ascenty QRO01 - Querétaro Mexico
- Ascenty QRO02 - Querétaro Mexico
- Ascenty RJO01 - Rio de Janeiro Brazil
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.