Ascenty FTZ01 - Fortaleza
Ascenty FTZ01 - Fortaleza is an operational data center operated by Ascenty DataCenters e Telecom in Maracanaú, Brazil. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Ascenty DataCenters e Telecom |
| Facility power | 16 MW (range 7.8 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,965 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 59 networks, 2 internet exchanges PeeringDB. |
| Also known as | Ascenty Infraestrutura de Data Centers |
| Address | TV. Francisco Marrocos Portela, 1161 Sl. 01, Alto Alegre I |
| Coordinates | -3.83080, -38.61125 |
| Website | ascenty.com/data-centers/ceara/fortaleza-1 |
Power and grid
| Nearest high-voltage substation | Subestação Fortaleza 2, 500 kV, 7.5 km away (Companhia Hidro Elétrica do São Francisco) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 1.7 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 26.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.9 °C (2001 to 2025) |
| Cooling degree days | 3,395 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.76 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Ceará) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Ascenty FTZ01 - Fortaleza use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
How close is Ascenty FTZ01 - Fortaleza to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Fortaleza 2 (500 kV), about 7.5 km away.
How clean is the power for Ascenty FTZ01 - Fortaleza?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Ascenty FTZ01 - Fortaleza?
Ascenty DataCenters e Telecom.
Data centers near Maracanaú
- Eletronet - Fortaleza 8.0 km
- Hostweb Data Center e Serviços 8.6 km
- TELLCORP - INTERNET DATA CENTER 10.2 km
- BR.Digital Fortaleza (FLA1) 12.6 km
- ETICE COLOC 13.4 km
- SecrelNet Informática Fortaleza 14.2 km
- SECRELNET INFORMATICA 16.6 km
- Giga+ (Alloha Fibra) 18.6 km
More Ascenty DataCenters e Telecom data centers
- Ascenty SPO01 - São Paulo Brazil
- Ascenty CPS01 - Campinas Brazil
- Ascenty HTL01 - Hortolândia Brazil
- Ascenty JDI01 - Jundiaí Brazil
- Ascenty QRO01 - Querétaro Mexico
- Ascenty QRO02 - Querétaro Mexico
- Ascenty RJO01 - Rio de Janeiro Brazil
- Ascenty SCL01 - Santiago Chile