Ascenty HTL01 - Hortolândia is an operational data center operated by Ascenty DataCenters e Telecom in Hortolandia, Brazil. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorAscenty DataCenters e Telecom
Networks11 networks
PeeringDB.
Also known asAscenty HTL02 - Hortolândia · Ascenty HTL03 - Hortolândia · Ascenty HTL04 - Hortolândia · Ascenty HTL05 - Hortolândia · Ascenty HTL06 - Hortolândia
AddressR. Papa João Paulo II, 4 - Jardim Santa Izabel
Coordinates-22.89602, -47.17925
Websiteascenty.com/data-centers/hortolandia/hortolandia-1

Power and grid

Nearest high-voltage substationSubestação Morro Azul, 138 kV, 1.4 km away (CPFL Paulista)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestação Sumaré, 440 kV, 11.5 km away
HV substations within 10 km11
Power plants within 50 km29 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature20.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.9 °C (2001 to 2025)
Cooling degree days1,181 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.07 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayLow - Medium (10-20%) (Brazil)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Ascenty HTL01 - Hortolândia to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação Morro Azul (138 kV), about 1.4 km away.

How clean is the power for Ascenty HTL01 - Hortolândia?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Who operates Ascenty HTL01 - Hortolândia?

Ascenty DataCenters e Telecom.

Data centers near Hortolandia

More Ascenty DataCenters e Telecom data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.