Ascenty HTL01 - Hortolândia
Ascenty HTL01 - Hortolândia is an operational data center operated by Ascenty DataCenters e Telecom in Hortolandia, Brazil. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Ascenty DataCenters e Telecom |
| Networks | 11 networks PeeringDB. |
| Also known as | Ascenty HTL02 - Hortolândia · Ascenty HTL03 - Hortolândia · Ascenty HTL04 - Hortolândia · Ascenty HTL05 - Hortolândia · Ascenty HTL06 - Hortolândia |
| Address | R. Papa João Paulo II, 4 - Jardim Santa Izabel |
| Coordinates | -22.89602, -47.17925 |
| Website | ascenty.com/data-centers/hortolandia/hortolandia-1 |
Power and grid
| Nearest high-voltage substation | Subestação Morro Azul, 138 kV, 1.4 km away (CPFL Paulista) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestação Sumaré, 440 kV, 11.5 km away |
| HV substations within 10 km | 11 |
| Power plants within 50 km | 29 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 20.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 1,181 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.07 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Brazil) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Ascenty HTL01 - Hortolândia to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Morro Azul (138 kV), about 1.4 km away.
How clean is the power for Ascenty HTL01 - Hortolândia?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Ascenty HTL01 - Hortolândia?
Ascenty DataCenters e Telecom.
Data centers near Hortolandia
- Odata 1.6 km · 19 MW
- Odata DC SP02 1.7 km
- Ascenty CPS01 - Campinas 5.6 km
- Scala Data Centers SVCPCP01 11.7 km
- PIX IMA 12.5 km
- Desktop Campinas 12.5 km
- PIX Unicamp 14.8 km
- Condomínio Galpões Comericiais (DATA CENTER) 15.7 km · 41 MW
More Ascenty DataCenters e Telecom data centers
- Ascenty FTZ01 - Fortaleza Brazil
- Ascenty SPO01 - São Paulo Brazil
- Ascenty CPS01 - Campinas Brazil
- Ascenty JDI01 - Jundiaí Brazil
- Ascenty QRO01 - Querétaro Mexico
- Ascenty QRO02 - Querétaro Mexico
- Ascenty RJO01 - Rio de Janeiro Brazil
- Ascenty SCL01 - Santiago Chile
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.