Cirion Buenos Aires - BUE1 is an operational data center operated by Cirion in Buenos Aires, Argentina. Our footprint estimate of its power is about 4.5 MW.

Key facts

StatusOperational
OperatorCirion
Facility power4.5 MW (range 2.2 MW to 7.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,713 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks79 networks, 4 internet exchanges
PeeringDB.
Also known asTelepuerto Cirion - CABA
AddressAv. Del Campo 1301
Coordinates-34.59025, -58.46716
Websiteciriontechnologies.com

Power and grid

Nearest high-voltage substationSubestación 047 Agronomía, 132 kV, 2.4 km away (Edenor)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestación Colegiales, 220 kV, 2.6 km away
HV substations within 10 km14
Power plants within 50 km6.5 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity345 g CO₂ per kWh (Argentina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41%

Climate and water

Average temperature16.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days740 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.79 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayLow - Medium (10-20%) (Argentina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Cirion Buenos Aires - BUE1 use?

We estimate the facility power at about 4.5 MW. Estimate from building footprint, low confidence.

How close is Cirion Buenos Aires - BUE1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación 047 Agronomía (132 kV), about 2.4 km away.

How clean is the power for Cirion Buenos Aires - BUE1?

The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.

Who operates Cirion Buenos Aires - BUE1?

Cirion.

Data centers near Buenos Aires

More Cirion data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.