Data Center Directory

Datacenter Claro

Datacenter Claro is an operational data center operated by Claro Argentina in Ciudad Autónoma de Buenos Aires, Argentina. Our footprint estimate of its power is about 1.2 MW.

Key facts

StatusOperational
OperatorClaro Argentina
Facility power1.2 MW (range 0.5 MW to 3.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,368 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 510 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressOlleros 2770, Ciudad Autónoma de Buenos Aires
Coordinates-34.57392, -58.44501

Power and grid

Nearest high-voltage substationSubestación Colegiales, 220 kV, 400 m away (Edenor)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km10
Power plants within 50 km6.5 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity345 g CO₂ per kWh (Argentina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41%

Climate and water

Average temperature16.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days740 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.79 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayLow - Medium (10-20%) (Argentina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Datacenter Claro use?

We estimate the facility power at about 1.2 MW. Estimate from building footprint, low confidence.

How close is Datacenter Claro to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Colegiales (220 kV), about 400 m away.

How clean is the power for Datacenter Claro?

The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.

Who operates Datacenter Claro?

Claro Argentina.

Data centers near Ciudad Autónoma de Buenos Aires

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.