Data Center GTD
Data Center GTD is an operational data center operated by GTD in Renca, Chile. Our footprint estimate of its power is about 3.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | GTD |
| Facility power | 3.1 MW (range 1.2 MW to 7.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,633 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Avenida Presidente Eduardo Frei Montalva 3615 |
| Coordinates | -33.39740, -70.68379 |
| Website | gtd.cl |
Power and grid
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 445 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data Center GTD use?
We estimate the facility power at about 3.1 MW. Estimate from building footprint, low confidence.
How clean is the power for Data Center GTD?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Who operates Data Center GTD?
GTD.
Data centers near Renca
- GTD Chile - Panamericana 1.2 km
- Cirion Santiago de Chile - SAN1 4.4 km · 1.2 MW
- Google Data Center 4.5 km · 18 MW
- SONDA - Quilicura 4.8 km · 2.1 MW
- SONDA - Teatinos 5.2 km
- GTD Chile - Lidice II 5.3 km
- Central de Transmisiones 5.6 km · 0.6 MW
- Nextstream Data Center 5.7 km