Central de Transmisiones
Central de Transmisiones is an operational data center in Providencia, Chile. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.6 MW (range 0.3 MW to 1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 518 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Camino de Servicio, Providencia |
| Coordinates | -33.42462, -70.63259 |
Power and grid
| Nearest high-voltage substation | Subestación San Cristóbal, 110 kV, 700 m away (Enel Distribución Chile) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación El Salto, 220 kV, 7.3 km away |
| HV substations within 10 km | 22 |
| Power plants within 50 km | 1.2 GW in 83 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 445 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Central de Transmisiones use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
How close is Central de Transmisiones to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación San Cristóbal (110 kV), about 700 m away.
How clean is the power for Central de Transmisiones?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Data centers near Providencia
- Adexus Santiago 1.9 km
- GTD Chile - Lidice II 2.0 km
- GTD Chile - Moneda 2.5 km
- Amazon Web Services 2.6 km
- Intesis Chile 2.6 km
- SONDA - Teatinos 2.6 km
- Datacenter Conavicoop 2.7 km
- PowerHost Santiago 2.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.