GTD Chile - Lidice II
GTD Chile - Lidice II is an operational data center operated by GTD Internet in Santiago, Chile. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | GTD Internet |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Also known as | GTD Chile - Lidice I |
| Address | Lidice 652 |
| Coordinates | -33.43542, -70.64919 |
| Website | gtd.cl/corporaciones/red-de-datacenter |
Power and grid
| Nearest high-voltage substation | Subestación San Cristóbal, 110 kV, 1.3 km away (Enel Distribución Chile) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación Neptuno, 220 kV, 7.2 km away |
| HV substations within 10 km | 23 |
| Power plants within 50 km | 1.2 GW in 83 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 445 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is GTD Chile - Lidice II to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación San Cristóbal (110 kV), about 1.3 km away.
How clean is the power for GTD Chile - Lidice II?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Who operates GTD Chile - Lidice II?
GTD Internet.
Data centers near Santiago
- Adexus Santiago 474 m
- SONDA - Teatinos 657 m
- GTD Chile - Moneda 732 m
- Datacenter Conavicoop 1.1 km
- entel - CNT (torre entel) 1.2 km
- Nextstream Data Center 1.2 km
- Mediaflog 1.8 km
- Central de Transmisiones 2.0 km · 0.6 MW
More GTD Internet data centers
- GTD Chile - Moneda Chile
- GTD Chile - Panamericana Chile
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.