Cologix MTL8
Cologix MTL8 is an operational data center operated by Cologix in Montreal, Canada. Our footprint estimate of its power is about 20 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Cologix |
| Facility power | 20 MW (range 9.8 MW to 31 MW) Estimate from building footprint, low confidence. Footprint estimate: about 16,266 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Cologix |
| Address | 7350 RUE FREDERICK-BANTING |
| Coordinates | 45.48108, -73.76992 |
| Website | cologix.com/data-centers/montreal/mtl8 |
Power and grid
| Nearest high-voltage substation | Poste des Sources, 315 kV, 2.8 km away (Hydro-Québec) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 2.9 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 6.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.6 °C (2001 to 2025) |
| Cooling degree days | 272 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.54 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Canada) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cologix MTL8 use?
We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.
How close is Cologix MTL8 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste des Sources (315 kV), about 2.8 km away.
How clean is the power for Cologix MTL8?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Cologix MTL8?
Cologix.
Data centers near Montreal
- Cologix MTL6 779 m
- Cologix MTL5 808 m
- Vantage Data Centers (QC1) 1.3 km · 7.9 MW
- Equinix MT1 - Montreal 2.1 km
- Vantage Data Centers (QC4) 2.5 km · 8.3 MW
- Enovum Data Centers - MTL02 5.4 km
- Aptum MTL2 8.7 km
- Cronomagic Canada Inc 9.0 km
More Cologix data centers
- Cologix ASH1 United States
- Cologix TOR4 Canada
- Cologix MIN1 United States
- Cologix COL4 United States
- Cologix COL1 United States
- Cologix CGY1 Canada
- Cologix JAX2 United States
- Cologix LAK1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.