Aptum MTL2
Aptum MTL2 is an operational data center operated by Aptum Technologies in Kirkland, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Aptum Technologies |
| Networks | 8 networks, 1 internet exchanges PeeringDB. |
| Also known as | eStruxture MTL-4 |
| Address | 17500 Trans-Canada Hwy |
| Coordinates | 45.44592, -73.86922 |
| Website | aptum.com/services/data-center/data-center-montreal-2 |
Power and grid
| Nearest high-voltage substation | Poste Saint-Jean, 315 kV, 4.1 km away (Hydro-Québec) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 2.9 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 6.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.6 °C (2001 to 2025) |
| Cooling degree days | 272 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.54 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Canada) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Aptum MTL2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste Saint-Jean (315 kV), about 4.1 km away.
How clean is the power for Aptum MTL2?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Aptum MTL2?
Aptum Technologies.
Data centers near Kirkland
- Enovum Data Centers - MTL02 3.3 km
- Root Data Center MTL-R2 4.2 km
- Vantage Data Centers (QC4) 6.2 km · 8.3 MW
- Cologix MTL8 8.7 km · 20 MW
- Cologix MTL6 9.4 km
- Cologix MTL5 9.5 km
- Vantage Data Centers (QC1) 10.0 km · 7.9 MW
- Equinix MT1 - Montreal 10.8 km
More Aptum Technologies data centers
- Aptum MTL1 Canada
- Aptum Portsmouth United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.