Cologix MIN1
Cologix MIN1 is an operational data center operated by Cologix in Minneapolis, United States. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Cologix |
| Facility power | 15 MW (range 7.3 MW to 23 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,196 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 83 networks, 6 internet exchanges PeeringDB. |
| Also known as | Cologix MIN2 · Cologix MIN3 · Cologix MIN4 · mindSHIFT Minneapolis · DataBank Minneapolis (MSP4) · Aureon Minneapolis |
| Address | 511 11th Ave S Ste 100 |
| Coordinates | 44.97141, -93.25458 |
| Website | cologix.com |
Power and grid
| Nearest high-voltage substation | 5th Street Substation, 115 kV, 1.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Terminal Substation, 345 kV, 4.5 km away |
| HV substations within 10 km | 9 |
| Utility | City Of St Paul Electric retail service territory (HIFLD, US government). |
| Balancing authority | SWPP |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 13.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.1 GW in 69 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 460 g CO₂ per kWh (Nebraska, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 46%, wind 29.4%, nuclear 17.4%, gas 3.2%, hydro 2.9%. Clean power: 50.7% |
| Industrial power price | USD 0.084 per kWh (Nebraska, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.6 °C (2001 to 2025) |
| Cooling degree days | 347 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.8 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Extremely High (>80%) (Nebraska) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cologix MIN1 use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
How close is Cologix MIN1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is 5th Street Substation (115 kV), about 1.6 km away. The local utility is City Of St Paul, in the SWPP balancing area.
How clean is the power for Cologix MIN1?
The grid in Nebraska emits about 460 g CO₂ per kWh (2025). Largest sources: coal 46%, wind 29.4%, nuclear 17.4%.
Who operates Cologix MIN1?
Cologix.
Data centers near Minneapolis
- TriTech Center 1.2 km
- T5@Minneapolis 1.2 km
- Atomic Data MSP250 1.5 km
- University of Minnesota Agate 1.5 km · 0.2 MW
- Advanced Operations Center 2.4 km · 2.1 MW
- Lumen Minneapolis 3 2.6 km · 2.3 MW
- Verizon data center in Minneapolis 3.0 km · 6.8 MW
- Implex Minneapolis 3.4 km
More Cologix data centers
- Cologix ASH1 United States
- Cologix TOR4 Canada
- Cologix MTL8 Canada
- Cologix COL4 United States
- Cologix COL1 United States
- Cologix CGY1 Canada
- Cologix JAX2 United States
- Cologix LAK1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.