T5@Minneapolis
T5@Minneapolis is an operational data center operated by T5 Data Centers in Minneapolis, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | T5 Data Centers |
| Address | 1001 3rd Ave South |
| Coordinates | 44.97153, -93.27034 |
| Website | t5datacenters.com/locations/minneapolis-colocation-data-center |
Power and grid
| Utility | City Of St Paul Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SWPP |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 13.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 460 g CO₂ per kWh (Nebraska, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 46%, wind 29.4%, nuclear 17.4%, gas 3.2%, hydro 2.9%. Clean power: 50.7% |
| Industrial power price | USD 0.084 per kWh (Nebraska, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.6 °C (2001 to 2025) |
| Cooling degree days | 347 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.8 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Extremely High (>80%) (Nebraska) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for T5@Minneapolis?
The grid in Nebraska emits about 460 g CO₂ per kWh (2025). Largest sources: coal 46%, wind 29.4%, nuclear 17.4%.
Who operates T5@Minneapolis?
T5 Data Centers.
Data centers near Minneapolis
- TriTech Center 844 m
- Atomic Data MSP250 1.1 km
- Cologix MIN1 1.2 km · 15 MW
- Lumen Minneapolis 3 2.0 km · 2.3 MW
- Verizon data center in Minneapolis 2.4 km · 6.8 MW
- University of Minnesota Agate 2.7 km · 0.2 MW
- Implex Minneapolis 3.3 km
- Advanced Operations Center 3.6 km · 2.1 MW
More T5 Data Centers data centers
- T5 Data Centers data center in Lithia Springs United States
- T5@Cleveland United States
- T5@Chicago United States
- T5@Colorado Springs United States
- T5@Charlotte United States
- T5@Atlanta United States
- T5@Augusta United States
- T5@Cincinnati United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.