University of Minnesota Agate
University of Minnesota Agate is an operational AI data center operated by University of Minnesota in Minneapolis, United States. Its power is about 0.2 MW. Epoch AI estimates about 83 H100-equivalent AI chips (NVIDIA A100 SXM4 40 GB).
Key facts
| Status | Operational |
|---|---|
| Operator | University of Minnesota |
| Facility power | 0.2 MW Reported (Epoch AI or owner data) |
| AI compute | 83 H100-equivalents |
| AI chips | NVIDIA A100 SXM4 40 GB Reported (Epoch AI or owner data) |
| Chip count | 264 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 97 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 117 Pleasant St SE # 5, Minneapolis, MN 55455 |
| Coordinates | 44.97528, -93.23635 |
Power and grid
| Nearest high-voltage substation | Hiawatha West Substation, 115 kV, 2.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Terminal Substation, 345 kV, 3.1 km away |
| HV substations within 10 km | 8 |
| Utility | City Of St Paul Electric retail service territory (HIFLD, US government). |
| Balancing authority | SWPP |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 13.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.1 GW in 67 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 344 g CO₂ per kWh (Minnesota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 25.1%, coal 23%, nuclear 21.5%, gas 20.7%, solar 5.9%. Clean power: 55.8% |
| Industrial power price | USD 0.100 per kWh (Minnesota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.6 °C (2001 to 2025) |
| Cooling degree days | 345 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.8 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Medium - High (20-40%) (Minnesota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| University of Minnesota Agate | NVIDIA A100 SXM4 40 GB | 264 | 0.2 MW | 2021-11-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does University of Minnesota Agate use?
Public data puts the facility power at about 0.2 MW. Reported (Epoch AI or owner data).
What chips does University of Minnesota Agate use?
Reported chips: NVIDIA A100 SXM4 40 GB.
How close is University of Minnesota Agate to the power grid?
The nearest high-voltage substation in OpenStreetMap is Hiawatha West Substation (115 kV), about 2.6 km away. The local utility is City Of St Paul, in the SWPP balancing area.
How clean is the power for University of Minnesota Agate?
The grid in Minnesota emits about 344 g CO₂ per kWh (2025). Largest sources: wind 25.1%, coal 23%, nuclear 21.5%.
Who operates University of Minnesota Agate?
University of Minnesota.
Data centers near Minneapolis
- Advanced Operations Center 906 m · 2.1 MW
- Cologix MIN1 1.5 km · 15 MW
- TriTech Center 2.4 km
- Atomic Data MSP250 2.5 km
- T5@Minneapolis 2.7 km
- Lumen Minneapolis 3 3.5 km · 2.3 MW
- Implex Minneapolis 3.7 km
- Verizon data center in Minneapolis 3.9 km · 6.8 MW
More University of Minnesota data centers
- Advanced Operations Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.