Expedient Columbus - Dublin
Expedient Columbus - Dublin is an operational data center operated by Expedient in Dublin, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Expedient |
| Networks | 4 networks PeeringDB. |
| Address | 5700 Innovation Drive |
| Coordinates | 40.09186, -83.14371 |
| Website | expedient.com/data-centers |
Power and grid
| Utility | City Of Columbus (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 10.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Expedient Columbus - Dublin?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Expedient Columbus - Dublin?
Expedient.
Data centers near Dublin
- DartPoints Dublin, OH - CMH1 873 m
- Amazon AWS: Hilliard Data Center 3.6 km · 32 MW
- Oppidan data center in Hilliard 4.6 km · 11 MW
- Amazon Web Services 4.8 km · 17 MW
- Amazon Web Services 4.9 km · 18 MW
- Amazon Web Services 5.4 km · 28 MW
- Amazon Web Services 5.6 km · 52 MW
- Amazon Web Services 5.7 km · 32 MW
More Expedient data centers
- Expedient Pittsburgh - Green Tree United States
- Expedient Baltimore - Owings Mills United States
- Expedient Boston United States
- Expedient Cleveland - 151 NEO United States
- Expedient Columbus - Upper Arlington United States
- Expedient Indianapolis United States
- Expedient Memphis United States
- Expedient Pittsburgh - Nova Place United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.