Oppidan data center in Hilliard
Oppidan data center in Hilliard is an operational data center operated by Oppidan in Hilliard, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Oppidan |
| Facility power | 11 MW (range 5.5 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,167 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.05267, -83.12742 |
Power and grid
| Nearest high-voltage substation | Davidson Substation, 138 kV, 300 m away (AEP Ohio) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 4 km away |
| HV substations within 10 km | 24 |
| Utility | City Of Columbus (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 5.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.5 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Oppidan data center in Hilliard use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is Oppidan data center in Hilliard to the power grid?
The nearest high-voltage substation in OpenStreetMap is Davidson Substation (138 kV), about 300 m away. The local utility is City Of Columbus, in the PJM balancing area.
How clean is the power for Oppidan data center in Hilliard?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Oppidan data center in Hilliard?
Oppidan.
Data centers near Hilliard
- Amazon AWS: Hilliard Data Center 990 m · 32 MW
- Amazon Web Services 3.5 km · 28 MW
- Data center in Hilliard 3.6 km · 36 MW
- Amazon Web Services 4.0 km · 25 MW
- Amazon Web Services 4.1 km · 28 MW
- Expedient Columbus - Upper Arlington 4.2 km
- DartPoints Dublin, OH - CMH1 4.5 km
- Expedient Columbus - Dublin 4.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.