Expedient Columbus - Upper Arlington
Expedient Columbus - Upper Arlington is an operational data center operated by Expedient in Upper Arlington, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Expedient |
| Networks | 2 networks PeeringDB. |
| Address | 5000 Arlington Centre Blvd., Building One |
| Coordinates | 40.05785, -83.07850 |
| Website | expedient.com/data-centers |
Power and grid
| Nearest high-voltage substation | Bethel Road Substation, 138 kV, 1.7 km away (AEP Ohio) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 6 km away |
| HV substations within 10 km | 25 |
| Utility | City Of Columbus (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 6.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.5 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Expedient Columbus - Upper Arlington to the power grid?
The nearest high-voltage substation in OpenStreetMap is Bethel Road Substation (138 kV), about 1.7 km away. The local utility is City Of Columbus, in the PJM balancing area.
How clean is the power for Expedient Columbus - Upper Arlington?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Expedient Columbus - Upper Arlington?
Expedient.
Data centers near Upper Arlington
- Oppidan data center in Hilliard 4.2 km · 11 MW
- Amazon AWS: Hilliard Data Center 4.8 km · 32 MW
- Data center in Hilliard 5.7 km · 36 MW
- Amazon Web Services 5.8 km · 28 MW
- DartPoints Dublin, OH - CMH1 6.1 km
- Amazon Web Services 6.1 km · 25 MW
- Expedient Columbus - Dublin 6.7 km
- Amazon Web Services 8.3 km · 28 MW
More Expedient data centers
- Expedient Pittsburgh - Green Tree United States
- Expedient Baltimore - Owings Mills United States
- Expedient Boston United States
- Expedient Cleveland - 151 NEO United States
- Expedient Columbus - Dublin United States
- Expedient Indianapolis United States
- Expedient Memphis United States
- Expedient Pittsburgh - Nova Place United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.