Expedient Memphis
Expedient Memphis is an operational data center operated by Expedient in Memphis, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Expedient |
| Networks | 2 networks PeeringDB. |
| Address | 3180 Players Lane |
| Coordinates | 35.06296, -89.78614 |
| Website | expedient.com/data-centers |
Power and grid
| Utility | City Of Memphis (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | TVA |
| Nearest gas pipeline | Trunkline Gas Co, interstate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.7 °C (2001 to 2025) |
| Cooling degree days | 1,212 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.42 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Expedient Memphis?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates Expedient Memphis?
Expedient.
Data centers near Memphis
- EdgeConneX Memphis (EDCMEM01) 9.5 km
- Level(3) Memphis 13.7 km
- DataBank Memphis (MEM1) 15.7 km
- Colossus 2 23.8 km · 1.3 GW
- MACROHARDRR 23.9 km · 16 MW
- Colossus 2 24.0 km · 48 MW
- Microhard 25.3 km · 20 MW
- Colossus 1 26.5 km · 425 MW
More Expedient data centers
- Expedient Pittsburgh - Green Tree United States
- Expedient Baltimore - Owings Mills United States
- Expedient Boston United States
- Expedient Cleveland - 151 NEO United States
- Expedient Columbus - Dublin United States
- Expedient Columbus - Upper Arlington United States
- Expedient Indianapolis United States
- Expedient Pittsburgh - Nova Place United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.