Colossus 2 is an operational data center operated by xAI in Southaven, United States. Our footprint estimate of its power is about 48 MW. Likely chips: NVIDIA GPUs (guess).

Key facts

StatusOperational
OperatorxAI
Facility power48 MW (range 19 MW to 119 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 398,318 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs
Guess from the operator, not confirmed. Frontier labs train on NVIDIA GPUs (Anthropic also uses TPU and Trainium).
GPU capacity if all AIabout 21,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates34.99817, -90.03724

Power and grid

UtilityCity Of Memphis (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineTexas Gas Transmission Co, interstate pipeline, 5.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity363 g CO₂ per kWh (Tennessee, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2%
Industrial power priceUSD 0.069 per kWh (Tennessee, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.7 °C (2001 to 2025)
Cooling degree days1,212 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.42 kWh per m² per day
Wind at 50 m5.9 m/s average
Water stress todayLow - Medium (10-20%) (Tennessee)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Colossus 2 use?

We estimate the facility power at about 48 MW. Estimate from building footprint, low confidence.

What chips does Colossus 2 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs.

How clean is the power for Colossus 2?

The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.

Who operates Colossus 2?

xAI.

Data centers near Southaven

More xAI data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.