xAI Colossus
xAI Colossus is an operational data center operated by xAI in Memphis, United States. Our footprint estimate of its power is about 126 MW. Likely chips: NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | xAI |
| Facility power | 126 MW (range 50 MW to 314 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,047,046 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs Guess from the operator, not confirmed. Frontier labs train on NVIDIA GPUs (Anthropic also uses TPU and Trainium). |
| GPU capacity if all AI | about 54,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Paul R Lowery Road 3231, Memphis |
| Coordinates | 35.05983, -90.15765 |
| Website | x.ai/colossus |
Power and grid
| Utility | City Of Memphis (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | TVA |
| Nearest gas pipeline | Enable Gas Transmission, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.7 °C (2001 to 2025) |
| Cooling degree days | 1,212 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.42 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does xAI Colossus use?
We estimate the facility power at about 126 MW. Estimate from building footprint, low confidence.
What chips does xAI Colossus use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs.
How clean is the power for xAI Colossus?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates xAI Colossus?
xAI.
Data centers near Memphis
- xAI Colossus Memphis 3.7 km · 352 MW
- Colossus 1 7.8 km · 425 MW
- Colossus 2 12.9 km · 48 MW
- Colossus 2 13.1 km · 1.3 GW
- MACROHARDRR 13.4 km · 16 MW
- Microhard 13.5 km · 20 MW
- Level(3) Memphis 20.9 km
- EdgeConneX Memphis (EDCMEM01) 24.8 km
More xAI data centers
- xAI Colossus Memphis United States
- Colossus 2 United States
- Microhard United States
- MACROHARDRR United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.