EdgeConneX Memphis (EDCMEM01)
EdgeConneX Memphis (EDCMEM01) is an operational data center operated by EdgeConneX in Memphis, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Networks | 6 networks PeeringDB. |
| Address | 4005 S Mendenhall Rd |
| Coordinates | 35.03899, -89.88623 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 161 kV, 900 m away (Memphis Light, Gas and Water) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 14.4 km away |
| HV substations within 10 km | 14 |
| Utility | City Of Memphis (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TVA |
| Nearest gas pipeline | Texas Gas Transmission Co, interstate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.1 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.7 °C (2001 to 2025) |
| Cooling degree days | 1,212 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.42 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeConneX Memphis (EDCMEM01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 900 m away. The local utility is City Of Memphis, in the TVA balancing area.
How clean is the power for EdgeConneX Memphis (EDCMEM01)?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates EdgeConneX Memphis (EDCMEM01)?
EdgeConneX.
Data centers near Memphis
- Level(3) Memphis 4.2 km
- Expedient Memphis 9.5 km
- Colossus 2 14.3 km · 1.3 GW
- MACROHARDRR 14.4 km · 16 MW
- Colossus 2 14.5 km · 48 MW
- Microhard 15.8 km · 20 MW
- Colossus 1 18.0 km · 425 MW
- DataBank Memphis (MEM1) 19.6 km
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.