DataBank Memphis (MEM1)
DataBank Memphis (MEM1) is an operational data center operated by DataBank in Memphis, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | DataBank |
| Networks | 5 networks PeeringDB. |
| Address | 7620 Appling Center Dr |
| Coordinates | 35.20309, -89.80862 |
| Website | databank.com/data-centers/memphis/mem1 |
Power and grid
| Utility | City Of Memphis (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | TVA |
| Nearest gas pipeline | Texas Gas Transmission Co, interstate pipeline, 900 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.7 °C (2001 to 2025) |
| Cooling degree days | 1,212 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.42 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for DataBank Memphis (MEM1)?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates DataBank Memphis (MEM1)?
DataBank.
Data centers near Memphis
- Expedient Memphis 15.7 km
- EdgeConneX Memphis (EDCMEM01) 19.6 km
- Level(3) Memphis 22.3 km
- Colossus 1 27.8 km · 425 MW
- Colossus 2 30.7 km · 1.3 GW
- Colossus 2 30.9 km · 48 MW
- MACROHARDRR 31.1 km · 16 MW
- xAI Colossus Memphis 31.9 km · 352 MW
More DataBank data centers
- Databank Orangeburg (LGA3) United States
- DataBank Salt Lake City (SLC2) United States
- DataBank Ashburn (IAD1) United States
- DataBank Dallas (DFW3) United States
- DataBank Las Vegas (LAS1) United States
- DataBank Dallas (DFW4) United States
- DataBank Minneapolis (MSP3) United States
- DataBank Seattle (SEA2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.