MACROHARDRR
MACROHARDRR is an operational data center operated by xAI in Southaven, United States. Our footprint estimate of its power is about 16 MW. Likely chips: NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | xAI |
| Facility power | 16 MW (range 6.3 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 131,119 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs Guess from the operator, not confirmed. Frontier labs train on NVIDIA GPUs (Anthropic also uses TPU and Trainium). |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | xAI Macrohardrr |
| Coordinates | 34.99346, -90.03423 |
Power and grid
| Utility | City Of West Memphis (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | AECI |
| Nearest gas pipeline | Texas Gas Transmission Co, interstate pipeline, 4.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 475 g CO₂ per kWh (Arkansas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.9%, coal 30.4%, nuclear 22.7%, solar 7.8%, hydro 4.9%. Clean power: 36.6% |
| Industrial power price | USD 0.079 per kWh (Arkansas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.7 °C (2001 to 2025) |
| Cooling degree days | 1,212 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.42 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Arkansas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MACROHARDRR use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
What chips does MACROHARDRR use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs.
How clean is the power for MACROHARDRR?
The grid in Arkansas emits about 475 g CO₂ per kWh (2025). Largest sources: gas 32.9%, coal 30.4%, nuclear 22.7%.
Who operates MACROHARDRR?
xAI.
Data centers near Southaven
- Colossus 2 506 m · 1.3 GW
- Colossus 2 591 m · 48 MW
- Microhard 1.7 km · 20 MW
- Level(3) Memphis 10.2 km
- Colossus 1 10.7 km · 425 MW
- xAI Colossus Memphis 11.4 km · 352 MW
- xAI Colossus 13.4 km · 126 MW
- EdgeConneX Memphis (EDCMEM01) 14.4 km
More xAI data centers
- xAI Colossus Memphis United States
- xAI Colossus United States
- Colossus 2 United States
- Microhard United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.