Colossus 1

Colossus 1 is an operational AI data center operated by SpaceXAI in Memphis, United States. Its power is about 425 MW. Epoch AI estimates about 276,000 H100-equivalent AI chips (H100, H200, B200).

Key facts

StatusOperational
OperatorSpaceXAI
UsersAnthropic
Facility power425 MW
Reported (Epoch AI or owner data)
IT power340 MW
AI compute276,000 H100-equivalents
AI chipsH100, H200, B200
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 190,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 12.9 billion
Epoch AI estimate, 2025 USD.
Energy partnersMLGW
Address3231 Riverport Rd, Memphis, TN 38109
Coordinates35.08285, -90.07638

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-04-2400Construction starts with a road added on site, retrofitting a former Electrolux building.
2024-08-1145 MW25,000First [significant/useful training workload](https://x.ai/colossus) on 25k H100s.
2024-09-02181 MW100,000[100k H100s online](https://archive.is/z39uN).
2025-02-17361 MW200,000150k H100s and 50k H200s online. This is roughly when [Musk](https://archive.is/z39uN) [said](https://archive.is/z39uN), plus on this date they reported "running jobs with 150K+ GPUs".
2025-03-06361 MW0Second substation almost connected (red cables)
2025-07-22442 MW276,00030k B200s [added](https://archive.is/oHQSA) (in GB200 configuration).
2025-09-17348 MW209,000Third substation looks completed, but it doesn't appear to be connected to the building yet. Some air-cooled chillers removed, while large cooling towers are added.
2025-10-19348 MW209,000There is still construction visible in the third substation yard and next to the new cooling towers.
2025-11-07442 MW276,000Third substation was expected to power the building in Fall.
2026-02-11425 MW276,000All air-cooled chillers have been disconnected and/or removed from the site, leaving only the cooling towers for cooling. The third substation looks complete, with red cables connected to the building.
2026-05-06425 MW276,000Anthropic [announces](https://www.anthropic.com/news/higher-limits-spacex) their agreement with SpaceX to use all of the compute capacity at Colossus 1. They state that this corresponds to more than 300 MW (presumably IT power) and over 220,000 GPUs. This is slightly different to previous reports adding up to 230,000 GPUs, but still roughly consistent with our estimates.
2026-06-01425 MW276,000We assume that Anthropic has started using Colossus 1 now, since the announcement said they would get access to 300 MW "within the month" of May.
2026-06-15425 MW276,000No major changes to the data center since February. Solar panels have been placed next to the facility.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-08-11H10025,000Reported
2024-09-02H100100,000Reported
2025-02-17H100150,000Reported
2025-02-17H20050,000Reported
2025-07-22B20030,000Reported
2026-06-01H20050,000Reported
2026-06-01B20030,000Reported
2026-06-01H100150,000Reported

Satellite view

Questions

How much power does Colossus 1 use?

Public data puts the facility power at about 425 MW. Reported (Epoch AI or owner data).

What chips does Colossus 1 use?

Reported chips: H100, H200, B200.

Who operates Colossus 1?

SpaceXAI. Reported users: Anthropic.