xAI QTS Atlanta is an operational AI data center operated by SpaceXAI in Atlanta, United States. Its power is about 24 MW. Epoch AI estimates about 11,000 H100-equivalent AI chips (H100, A100).

Key facts

StatusOperational
OperatorSpaceXAI
UsersSpaceXAI
Facility power24 MW
Reported (Epoch AI or owner data)
IT power17 MW
AI compute11,000 H100-equivalents
AI chipsH100, A100
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 9,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 0.7 billion
Epoch AI estimate, 2025 USD.
Also known asQTS Atlanta Data Center 2
Address1025 Jefferson Street NW, Atlanta, GA 30318
Coordinates33.77719, -84.41955
Websiteqtsdatacenters.com/data-centers/atlanta

Power and grid

Nearest high-voltage substationQTS Substation #2, 115 kV, 100 m away (Georgia Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 1 km away
HV substations within 10 km52
UtilityGeorgia Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 7.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.9 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days1,020 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-01-2300X Corp's $700 million investment in AI training hardware for the Atlanta data center is approved by the Development Authority of Fulton County ([bond resolution fact sheet](https://www.developfultoncounty.com/meetings-and-minutes_239_547601452.pdf)).
2025-02-2024 MW11,000xAI's GPU cluster in the QTS Atlanta building at 1025 Jefferson Street NW is operational around this time. This date is a tentative estimate: Business Insider reported the buildout in February 2025, so the cluster likely came online around or shortly after then, though the exact date is not disclosed. The cluster comprises 11,000 NVIDIA H100 and about 1,448 A100 GPUs, based on documents submitted to Develop Fulton as [reported by Business Insider](https://www.businessinsider.com/xai-elon-musk-x-new-atlanta-data-center-2025-2). xAI occupies part of this multi-tenant building, so its cooling is not attributed to xAI alone.
2025-08-2124 MW11,000No significant change to the building since the cluster became operational.
2026-07-1024 MW11,000No significant change to the building since the August 2025 image.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-02-20H10011,000Reported
2025-02-20A1001,448Estimate

Satellite view

Questions

How much power does xAI QTS Atlanta use?

Public data puts the facility power at about 24 MW. Reported (Epoch AI or owner data).

What chips does xAI QTS Atlanta use?

Reported chips: H100, A100.

How close is xAI QTS Atlanta to the power grid?

The nearest high-voltage substation in OpenStreetMap is QTS Substation #2 (115 kV), about 100 m away. The local utility is Georgia Power Co, in the SOCO balancing area.

How clean is the power for xAI QTS Atlanta?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates xAI QTS Atlanta?

SpaceXAI. Reported users: SpaceXAI.

Data centers near Atlanta

More SpaceXAI data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.