Expedient Baltimore - Owings Mills
Expedient Baltimore - Owings Mills is an operational data center operated by Expedient in Baltimore, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Expedient |
| Networks | 1 networks PeeringDB. |
| Also known as | Expedient Owings Mills |
| Address | 11155 Red Run Blvd., Suite 200 |
| Coordinates | 39.42712, -76.81171 |
| Website | expedient.com/data-centers |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 1 km away (Baltimore Gas and Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 4.4 km away |
| HV substations within 10 km | 14 |
| Utility | Baltimore Gas & Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.6 GW in 50 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 295 g CO₂ per kWh (Maryland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 40.7%, nuclear 37.6%, solar 7.6%, coal 5.8%, hydro 4%. Clean power: 51.7% |
| Industrial power price | USD 0.122 per kWh (Maryland, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.5 °C (2001 to 2025) |
| Cooling degree days | 634 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.04 kWh per m² per day |
| Wind at 50 m | 6 m/s average |
| Water stress today | Low - Medium (10-20%) (Maryland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Expedient Baltimore - Owings Mills to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1 km away. The local utility is Baltimore Gas & Electric Co, in the PJM balancing area.
How clean is the power for Expedient Baltimore - Owings Mills?
The grid in Maryland emits about 295 g CO₂ per kWh (2025). Largest sources: gas 40.7%, nuclear 37.6%, solar 7.6%.
Who operates Expedient Baltimore - Owings Mills?
Expedient.
Data centers near Baltimore
- Lumen Baltimore 22.3 km
- TierPoint Baltimore 23.3 km · 4.1 MW
- Zayo Baltimore - 111 Market Pl 23.5 km
- Expedient Tidepoint 25.4 km
- TierPoint Baltimore BWI 26.2 km · 7.4 MW
- TierPoint Baltimore – BWI 26.3 km
- Cogent Elkridge 26.3 km · 6.3 MW
- Johns Hopkins Data Center 26.8 km · 0.6 MW
More Expedient data centers
- Expedient Pittsburgh - Green Tree United States
- Expedient Boston United States
- Expedient Cleveland - 151 NEO United States
- Expedient Columbus - Dublin United States
- Expedient Columbus - Upper Arlington United States
- Expedient Indianapolis United States
- Expedient Memphis United States
- Expedient Pittsburgh - Nova Place United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.