Data Center Directory

TierPoint Baltimore BWI

TierPoint Baltimore BWI is an operational data center in Linthicum Heights, United States. Our footprint estimate of its power is about 7.4 MW.

Key facts

StatusOperational
Facility power7.4 MW (range 3.7 MW to 12 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,159 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressPinnacle Drive 813, 21090, Linthicum Heights
Coordinates39.21346, -76.68283

Power and grid

Nearest high-voltage substationShipley Substation, 115 kV, 2.9 km away (Baltimore Gas and Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPumphrey Substation, 230 kV, 4.4 km away
HV substations within 10 km11
UtilityBaltimore Gas & Electric Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 19.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.9 GW in 73 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity295 g CO₂ per kWh (Maryland, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 40.7%, nuclear 37.6%, solar 7.6%, coal 5.8%, hydro 4%. Clean power: 51.7%
Industrial power priceUSD 0.122 per kWh (Maryland, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.3 °C (2001 to 2025)
Cooling degree days777 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.04 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayLow - Medium (10-20%) (Maryland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TierPoint Baltimore BWI use?

We estimate the facility power at about 7.4 MW. Estimate from building footprint, low confidence.

How close is TierPoint Baltimore BWI to the power grid?

The nearest high-voltage substation in OpenStreetMap is Shipley Substation (115 kV), about 2.9 km away. The local utility is Baltimore Gas & Electric Co, in the PJM balancing area.

How clean is the power for TierPoint Baltimore BWI?

The grid in Maryland emits about 295 g CO₂ per kWh (2025). Largest sources: gas 40.7%, nuclear 37.6%, solar 7.6%.

Data centers near Linthicum Heights

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.