TierPoint Baltimore BWI
TierPoint Baltimore BWI is an operational data center in Linthicum Heights, United States. Our footprint estimate of its power is about 7.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 7.4 MW (range 3.7 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,159 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Pinnacle Drive 813, 21090, Linthicum Heights |
| Coordinates | 39.21346, -76.68283 |
Power and grid
| Nearest high-voltage substation | Shipley Substation, 115 kV, 2.9 km away (Baltimore Gas and Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Pumphrey Substation, 230 kV, 4.4 km away |
| HV substations within 10 km | 11 |
| Utility | Baltimore Gas & Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 19.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.9 GW in 73 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 295 g CO₂ per kWh (Maryland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 40.7%, nuclear 37.6%, solar 7.6%, coal 5.8%, hydro 4%. Clean power: 51.7% |
| Industrial power price | USD 0.122 per kWh (Maryland, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 777 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.04 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Maryland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TierPoint Baltimore BWI use?
We estimate the facility power at about 7.4 MW. Estimate from building footprint, low confidence.
How close is TierPoint Baltimore BWI to the power grid?
The nearest high-voltage substation in OpenStreetMap is Shipley Substation (115 kV), about 2.9 km away. The local utility is Baltimore Gas & Electric Co, in the PJM balancing area.
How clean is the power for TierPoint Baltimore BWI?
The grid in Maryland emits about 295 g CO₂ per kWh (2025). Largest sources: gas 40.7%, nuclear 37.6%, solar 7.6%.
Data centers near Linthicum Heights
- TierPoint Baltimore – BWI 257 m
- Cogent Elkridge 2.8 km · 6.3 MW
- TierPoint Baltimore 8.5 km · 4.1 MW
- Lumen Baltimore 10.2 km
- Expedient Tidepoint 10.4 km
- Zayo Baltimore - 111 Market Pl 10.5 km
- AiNET MD-790R 10.7 km · 11 MW
- Johns Hopkins Data Center 14.4 km · 0.6 MW
Sources
Correct this page or get the data