TierPoint Baltimore – BWI

TierPoint Baltimore – BWI is an operational data center operated by TierPoint in Linthicum Heights, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorTierPoint
Networks2 networks, 1 internet exchanges
PeeringDB.
Also known asTunBroker Baltimore
Address813 Pinnacle Drive
Coordinates39.21381, -76.67989
Websitetierpoint.com

Power and grid

Nearest high-voltage substationShipley Substation, 115 kV, 2.7 km away (Baltimore Gas and Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPumphrey Substation, 230 kV, 4.1 km away
HV substations within 10 km11
UtilityBaltimore Gas & Electric Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 19.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.9 GW in 73 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity295 g CO₂ per kWh (Maryland, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 40.7%, nuclear 37.6%, solar 7.6%, coal 5.8%, hydro 4%. Clean power: 51.7%
Industrial power priceUSD 0.122 per kWh (Maryland, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.3 °C (2001 to 2025)
Cooling degree days777 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.04 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayLow - Medium (10-20%) (Maryland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is TierPoint Baltimore – BWI to the power grid?

The nearest high-voltage substation in OpenStreetMap is Shipley Substation (115 kV), about 2.7 km away. The local utility is Baltimore Gas & Electric Co, in the PJM balancing area.

How clean is the power for TierPoint Baltimore – BWI?

The grid in Maryland emits about 295 g CO₂ per kWh (2025). Largest sources: gas 40.7%, nuclear 37.6%, solar 7.6%.

Who operates TierPoint Baltimore – BWI?

TierPoint.