Expedient Pittsburgh - Nova Place

Expedient Pittsburgh - Nova Place is an operational data center operated by Expedient in Pittsburgh, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorExpedient
Networks2 networks
PeeringDB.
Also known asExpedient Pittsburgh Nova Place
Address1 Allegheny Center,
Coordinates40.45185, -80.00586
Websiteexpedient.com/data-centers

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 1.8 km away (Duquesne Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 345 kV, 3.7 km away
HV substations within 10 km16
UtilityDuquesne Light Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineEquitrans Inc, interstate pipeline, 5.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.3 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity387 g CO₂ per kWh (Pennsylvania, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 58%, nuclear 30.3%, coal 7.1%, wind 1.4%, solar 1.4%. Clean power: 34.3%
Industrial power priceUSD 0.105 per kWh (Pennsylvania, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.7 °C (2001 to 2025)
Cooling degree days470 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.72 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayLow - Medium (10-20%) (Pennsylvania)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Expedient Pittsburgh - Nova Place to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1.8 km away. The local utility is Duquesne Light Co, in the PJM balancing area.

How clean is the power for Expedient Pittsburgh - Nova Place?

The grid in Pennsylvania emits about 387 g CO₂ per kWh (2025). Largest sources: gas 58%, nuclear 30.3%, coal 7.1%.

Who operates Expedient Pittsburgh - Nova Place?

Expedient.

Data centers near Pittsburgh

More Expedient data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.