Data center in Delaware
Data center in Delaware is an operational data center in Delaware, United States. Our footprint estimate of its power is about 32 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 32 MW (range 16 MW to 51 MW) Estimate from building footprint, low confidence. Footprint estimate: about 26,655 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Greif Parkway 306, 43015, Delaware |
| Coordinates | 40.22453, -83.04579 |
Power and grid
| Utility | Ohio Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 22.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Delaware use?
We estimate the facility power at about 32 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Delaware?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Data centers near Delaware
- Centersquare Columbus (CMH1) 6.9 km
- Cologix COL4 12.4 km · 9.1 MW
- Cologix COL1 12.6 km · 5.3 MW
- DataCenter.BZ - Worthington-Columbus 12.7 km · 9.9 MW
- WēConnect Westerville 14.2 km
- DartPoints Dublin, OH - CMH1 16.4 km
- Expedient Columbus - Dublin 16.9 km
- Amazon Web Services 17.3 km · 58 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.