WēConnect Westerville
WēConnect Westerville is an operational data center operated by City of Westerville in Westerville, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | City of Westerville |
| Networks | 2 networks, 1 internet exchanges PeeringDB. |
| Address | 35 Collegeview Rd |
| Coordinates | 40.12363, -82.94400 |
| Website | business.westerville.org/business-support/weconnect |
Power and grid
| Utility | City Of Westerville (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 8.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for WēConnect Westerville?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates WēConnect Westerville?
City of Westerville.
Data centers near Westerville
- Cologix COL4 4.8 km · 9.1 MW
- DataCenter.BZ - Worthington-Columbus 5.0 km · 9.9 MW
- Cologix COL1 5.0 km · 5.3 MW
- Centersquare Columbus (CMH1) 7.6 km
- TJX Corporate Techno 11.6 km · 11 MW
- Compugen New Albany 12.0 km · 6.5 MW
- STACK New Albany 12.3 km · 5.7 MW
- Meta Prometheus 12.4 km · 612 MW