Compugen New Albany
Compugen New Albany is an operational data center in New Albany, United States. Our footprint estimate of its power is about 6.5 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.5 MW (range 3.3 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,421 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.10460, -82.80491 |
Power and grid
| Utility | Ohio Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 300 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Compugen New Albany use?
We estimate the facility power at about 6.5 MW. Estimate from building footprint, low confidence.
How clean is the power for Compugen New Albany?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Data centers near New Albany
- STACK New Albany 400 m · 5.7 MW
- TJX Corporate Techno 491 m · 11 MW
- Meta Prometheus 2.6 km · 612 MW
- Amazon New Albany: Jug and Beach Road 4.6 km · 50 MW
- Amazon Web Services CMH56 4.6 km · 16 MW
- Amazon Web Services Datacenter Complex 4.8 km · 21 MW
- Vantage OH1 Data Center Campus 4.9 km · 30 MW
- Vantage Building 3 4.9 km · 41 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.