Vantage Building 3 is an operational data center operated by Vantage in New Albany, United States. Our footprint estimate of its power is about 41 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vantage |
| Facility power | 41 MW (range 20 MW to 66 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,063 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 18,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Horizon Court 3205, 43031, New Albany |
| Opened | 2025-03-01 |
| Coordinates | 40.09876, -82.74724 |
Power and grid
| Nearest high-voltage substation | Badger Substation, 138 kV, 300 m away (American Electric Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Jug Street Substation, 345 kV, 400 m away |
| HV substations within 10 km | 23 |
| Utility | Licking Rural Electric INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 532 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage Building 3 use?
We estimate the facility power at about 41 MW. Estimate from building footprint, low confidence.
How close is Vantage Building 3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Badger Substation (138 kV), about 300 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.
How clean is the power for Vantage Building 3?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Vantage Building 3?
Vantage.
Data centers near New Albany
- Vantage OH1 Data Center Campus 293 m · 30 MW
- Amazon Web Services CMH56 478 m · 16 MW
- Amazon New Albany: Jug and Beach Road 579 m · 50 MW
- Amazon Web Services Datacenter Complex 608 m · 21 MW
- Amazon Web Services 1.3 km · 24 MW
- Amazon New Albany: Innovation Campus Way 1.6 km · 38 MW
- Amazon Web Services 1.8 km · 23 MW
- AWS New Albany 2.0 km · 255 MW
More Vantage data centers
- Vantage OH1 Data Center Campus United States
- Vantage Quincy Campus United States
- Vantage data center in Santa Clara United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.