Vantage Building 3

Vantage Building 3 is an operational data center operated by Vantage in New Albany, United States. Our footprint estimate of its power is about 41 MW.

Key facts

StatusOperational
OperatorVantage
Facility power41 MW (range 20 MW to 66 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,063 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 18,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressHorizon Court 3205, 43031, New Albany
Opened2025-03-01
Coordinates40.09876, -82.74724

Power and grid

Nearest high-voltage substationBadger Substation, 138 kV, 300 m away (American Electric Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationJug Street Substation, 345 kV, 400 m away
HV substations within 10 km23
UtilityLicking Rural Electric INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 3.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days532 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Vantage Building 3 use?

We estimate the facility power at about 41 MW. Estimate from building footprint, low confidence.

How close is Vantage Building 3 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Badger Substation (138 kV), about 300 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.

How clean is the power for Vantage Building 3?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates Vantage Building 3?

Vantage.