AWS New Albany
AWS New Albany is an operational data center that is still expanding, operated by Amazon Web Services in New Albany, United States. Its power is about 255 MW, growing to about 405 MW by 2027-07. Epoch AI estimates about 201,000 H100-equivalent AI chips (Trainium2, H100, H200, B200).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 255 MW Reported (Epoch AI or owner data) |
| IT power | 213 MW |
| Planned power | 405 MW by 2027-07-01 Epoch AI timeline projection. |
| AI compute | 201,000 H100-equivalents → 352,000 planned |
| AI chips | Trainium2, H100, H200, B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 120,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 8.1 billion → 12.8 billion planned Epoch AI estimate, 2025 USD. |
| Address | 13360 Miller Rd NW |
| Coordinates | 40.11581, -82.73954 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2022-06-01 | 0 | 0 | Land clearing begins for Buildings 5-9 (eastern campus). |
| 2024-12-01 | 136 MW | 92,000 | Buildings 5-9 (eastern campus) operational. [New Albany’s Dec. 2024 report](https://newalbanyohio.org/wp-content/uploads/2025/01/CD-2024-12.pdf) lists AWS partial occupancy for 5 buildings at the eastern campus. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances [listed](https://docs.aws.amazon.com/ec2/latest/instancetypes/ec2-instance-regions.html). The full IT power is much higher than 113 MW. |
| 2026-03-12 | 255 MW | 201,000 | Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on satellite imagery, northern campus Buildings 1-3 appear in late construction, with all roofs complete but nearby generator/cooling equipment still being installed for buildings 2-3. Building 4 is still early in construction. Eastern campus Buildings 5-9 appear complete and operational as expected. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances [listed](https://docs.aws.amazon.com/ec2/latest/instancetypes/ec2-instance-regions.html). |
| 2026-05-18 | 255 MW | 201,000 | Satellite imagery shows Building 1 in the northern campus still appears structurally finished, with no visible change from the prior two months, but we're still not counting it operational due to visible construction work around the perimeter. Buildings 2-3 still have nearby generators/cooling equipment being installed, and Building 4 is only roughly 80% roofed. Eastern campus Buildings 5-9 remain operational. Middle campus Buildings 10, 12, 13, and 14 remain operational; Building 11 is still installing backup generators and is not counted. |
| 2027-07-01 (projected) | 405 MW | 352,000 | Expected operational date for the remaining tracked buildings (11, and 1-4) across the three campuses. This estimate is based on the previous buildings taking roughly 1.5 years from steel framing to complete operational status. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances [listed](https://docs.aws.amazon.com/ec2/latest/instancetypes/ec2-instance-regions.html). |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-12-01 | Trainium2 | 8,714 | Estimate |
| 2024-12-01 | H100 | 64,944 | Estimate |
| 2024-12-01 | H200 | 21,648 | Estimate |
| 2026-03-12 | Trainium2 | 36,702 | Estimate |
| 2026-03-12 | B200 | 34,917 | Estimate |
| 2026-03-12 | H200 | 23,603 | Estimate |
| 2026-05-18 | B200 | 46,847 | Estimate |
| 2027-07-01 | B200 | 94,566 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AWS New Albany use?
Public data puts the facility power at about 255 MW, with about 405 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does AWS New Albany use?
Reported chips: Trainium2, H100, H200, B200.
Who operates AWS New Albany?
Amazon Web Services.
Data centers near New Albany
- Vantage OH1 Data Center Campus 1.7 km · 30 MW
- Amazon New Albany: Jug and Beach Road 1.7 km · 50 MW
- Vantage Building 3 2.0 km · 41 MW
- Amazon Web Services 2.3 km · 24 MW
- Amazon Web Services CMH56 2.4 km · 16 MW
- Amazon New Albany: Innovation Campus Way 2.6 km · 38 MW
- Amazon Web Services Datacenter Complex 2.6 km · 21 MW
- Amazon Web Services 2.8 km · 23 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
- Amazon Web Services United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.