Amazon Ridgeland
Amazon Ridgeland is an operational data center that is still expanding, operated by Amazon Web Services in Mississippi, United States. Its power is about 273 MW, growing to about 1.0 GW by 2028-09. Epoch AI estimates about 171,000 H100-equivalent AI chips (Trainium2).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Amazon Web Services |
| Users | Anthropic (speculative) |
| Project | Project Rainier |
| Facility power | 273 MW Reported (Epoch AI or owner data) |
| IT power | 228 MW |
| Planned power | 1.0 GW by 2028-09-29 Epoch AI timeline projection. |
| AI compute | 171,000 H100-equivalents → 788,000 planned |
| AI chips | Trainium2 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 130,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 8.6 billion → 31.8 billion planned Epoch AI estimate, 2025 USD. |
| Energy partners | Entergy |
| Address | 1626 County Line Road Ridgeland, Mississippi |
| Coordinates | 32.40003, -90.19717 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-02-24 | 0 | 0 | Land clearing begins |
| 2025-10-04 | 0 | 0 | Roof complete on Buildings 3 |
| 2026-05-15 | 273 MW | 171,000 | Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling equipment. |
| 2027-02-09 (projected) | 341 MW | 214,000 | Building 5 is operational (estimate). |
| 2028-09-29 (projected) | 1.0 GW | 788,000 | Buildings 6-14 are operational (estimate). Buildings 1-4 took an estimated 2.25 years on this site. We assume Buildings 6-14 get underway by July 2026, and take the same time as Buildings 1-4. This is later than the [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/). |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-05-15 | Trainium2 | 261,244 | Estimate |
| 2028-09-29 | Trainium3 | 502,392 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon Ridgeland use?
Public data puts the facility power at about 273 MW, with about 1.0 GW planned by 2028. Reported (Epoch AI or owner data).
What chips does Amazon Ridgeland use?
Reported chips: Trainium2.
Who operates Amazon Ridgeland?
Amazon Web Services. Reported users: Anthropic.
Data centers near Mississippi
- AWS Ridgeland Data Center 1.2 km · 151 MW
- Amazon Web Services 1.4 km · 19 MW
- Amazon Web Services 1.5 km · 19 MW
- Data center in Canton 23.5 km · 19 MW
- Data center in Canton 23.7 km · 19 MW
- Data center in Canton 23.7 km · 19 MW
- Data center in Canton 23.8 km · 19 MW
- AWS Canton Data Center 24.0 km · 253 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
- Amazon Web Services United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.