Data center in Canton
Data center in Canton is a data center under construction in Canton, United States. Our footprint estimate of its power is about 19 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 19 MW (range 9.4 MW to 30 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,709 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 32.59605, -90.09443 |
Power and grid
| Utility | Yazoo Valley Elec Power Assn (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Texas Eastern Trans Co, interstate pipeline, 400 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 454 g CO₂ per kWh (Mississippi, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 73.9%, nuclear 14.7%, coal 5.3%, solar 3.7%, bioenergy 1.7%. Clean power: 20.8% |
| Industrial power price | USD 0.076 per kWh (Mississippi, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.3 °C (2001 to 2025) |
| Cooling degree days | 1,329 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.58 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Mississippi) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Canton use?
We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Canton?
The grid in Mississippi emits about 454 g CO₂ per kWh (2025). Largest sources: gas 73.9%, nuclear 14.7%, coal 5.3%.
Data centers near Canton
- Data center in Canton 175 m · 19 MW
- AWS Canton Data Center 319 m · 253 MW
- Data center in Canton 336 m · 19 MW
- Data center in Canton 379 m · 19 MW
- Amazon Madison Mega Site 5.7 km · 341 MW
- Amazon Web Services 22.3 km · 19 MW
- Amazon Web Services 22.4 km · 19 MW
- AWS Ridgeland Data Center 22.7 km · 151 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.