Data Center Directory

Amazon Madison Mega Site

Amazon Madison Mega Site is an operational data center that is still expanding, operated by Amazon Web Services in Mississippi Madison County, United States. Its power is about 341 MW, growing to about 819 MW by 2028-03. Epoch AI estimates about 214,000 H100-equivalent AI chips (Trainium2).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorAmazon Web Services
UsersAnthropic (speculative)
ProjectProject Rainier
Facility power341 MW
Reported (Epoch AI or owner data)
IT power284 MW
Planned power819 MW by 2028-03-15
Epoch AI timeline projection.
AI compute214,000 H100-equivalents → 514,000 planned
AI chipsTrainium2
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 160,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 10.8 billion → 25.9 billion planned
Epoch AI estimate, 2025 USD.
AddressAmazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County
Coordinates32.61260, -90.03675 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2023-10-0200Land clearing begins
2025-03-1100Generators and chillers still being installed on buildings 1-5.
2025-06-23341 MW214,000Buildings 1-5 are operational, based on roofs being completed 5 months ago and generators being installed by 2025-04-10.
2025-10-04341 MW214,000Confirmation that five buildings are fully equipped with cooling and backup generators.
2026-06-04341 MW214,000Buildings 6 and 7 roof completed. Building 8 roof nearly completed. Building 9 roof half way up. No new operational buildings.
2027-03-01 (projected)478 MW300,000Buildings 6 and 7 operational, estimated from roofs having been completed 9 months ago (similar timeline to AWS buildings at New Carlisle in 2025).
2028-03-15 (projected)819 MW514,000Buildings 8-12 are operational. In June of 2026 only a faint outline of buildings 10,11 and 12 is visible, estimating construction completion to be the end of 2027, alligning with [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/). This final estimates adds three months to that for server installation.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-06-23Trainium2326,555Estimate
2028-03-15Trainium2783,732Estimate

Satellite view

Questions

How much power does Amazon Madison Mega Site use?

Public data puts the facility power at about 341 MW, with about 819 MW planned by 2028. Reported (Epoch AI or owner data).

What chips does Amazon Madison Mega Site use?

Reported chips: Trainium2.

Who operates Amazon Madison Mega Site?

Amazon Web Services. Reported users: Anthropic.

Data centers near Mississippi Madison County

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.