Amazon Madison Mega Site
Amazon Madison Mega Site is an operational data center that is still expanding, operated by Amazon Web Services in Mississippi Madison County, United States. Its power is about 341 MW, growing to about 819 MW by 2028-03. Epoch AI estimates about 214,000 H100-equivalent AI chips (Trainium2).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Amazon Web Services |
| Users | Anthropic (speculative) |
| Project | Project Rainier |
| Facility power | 341 MW Reported (Epoch AI or owner data) |
| IT power | 284 MW |
| Planned power | 819 MW by 2028-03-15 Epoch AI timeline projection. |
| AI compute | 214,000 H100-equivalents → 514,000 planned |
| AI chips | Trainium2 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 160,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 10.8 billion → 25.9 billion planned Epoch AI estimate, 2025 USD. |
| Address | Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County |
| Coordinates | 32.61260, -90.03675 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-10-02 | 0 | 0 | Land clearing begins |
| 2025-03-11 | 0 | 0 | Generators and chillers still being installed on buildings 1-5. |
| 2025-06-23 | 341 MW | 214,000 | Buildings 1-5 are operational, based on roofs being completed 5 months ago and generators being installed by 2025-04-10. |
| 2025-10-04 | 341 MW | 214,000 | Confirmation that five buildings are fully equipped with cooling and backup generators. |
| 2026-06-04 | 341 MW | 214,000 | Buildings 6 and 7 roof completed. Building 8 roof nearly completed. Building 9 roof half way up. No new operational buildings. |
| 2027-03-01 (projected) | 478 MW | 300,000 | Buildings 6 and 7 operational, estimated from roofs having been completed 9 months ago (similar timeline to AWS buildings at New Carlisle in 2025). |
| 2028-03-15 (projected) | 819 MW | 514,000 | Buildings 8-12 are operational. In June of 2026 only a faint outline of buildings 10,11 and 12 is visible, estimating construction completion to be the end of 2027, alligning with [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/). This final estimates adds three months to that for server installation. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-06-23 | Trainium2 | 326,555 | Estimate |
| 2028-03-15 | Trainium2 | 783,732 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon Madison Mega Site use?
Public data puts the facility power at about 341 MW, with about 819 MW planned by 2028. Reported (Epoch AI or owner data).
What chips does Amazon Madison Mega Site use?
Reported chips: Trainium2.
Who operates Amazon Madison Mega Site?
Amazon Web Services. Reported users: Anthropic.
Data centers near Mississippi Madison County
- AWS Canton Data Center 5.4 km · 253 MW
- Data center in Canton 5.7 km · 19 MW
- Data center in Canton 5.8 km · 19 MW
- Data center in Canton 6.0 km · 19 MW
- Data center in Canton 6.1 km · 19 MW
- Amazon Web Services 26.5 km · 19 MW
- Amazon Web Services 26.7 km · 19 MW
- AWS Ridgeland Data Center 26.9 km · 151 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
- Amazon Web Services United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.