Data center in Canton

Data center in Canton is a data center under construction in Canton, United States. Our footprint estimate of its power is about 19 MW.

Key facts

StatusUnder construction
Facility power19 MW (range 9.4 MW to 30 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 15,712 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates32.59446, -90.09800

Power and grid

UtilityYazoo Valley Elec Power Assn (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineTexas Eastern Trans Co, interstate pipeline, 300 m away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity454 g CO₂ per kWh (Mississippi, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 73.9%, nuclear 14.7%, coal 5.3%, solar 3.7%, bioenergy 1.7%. Clean power: 20.8%
Industrial power priceUSD 0.076 per kWh (Mississippi, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.3 °C (2001 to 2025)
Cooling degree days1,329 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.58 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayLow - Medium (10-20%) (Mississippi)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Canton use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Canton?

The grid in Mississippi emits about 454 g CO₂ per kWh (2025). Largest sources: gas 73.9%, nuclear 14.7%, coal 5.3%.

Data centers near Canton