Amazon Web Services CMH56 is an operational data center operated by Amazon Web Services in New Albany, United States. Our footprint estimate of its power is about 16 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 16 MW (range 8.2 MW to 26 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,586 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.09653, -82.75205 |
Power and grid
| Nearest high-voltage substation | Smith's Mill Substation, 138 kV, 200 m away (Energy Cooperative) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Jug Street Substation, 345 kV, 300 m away |
| HV substations within 10 km | 24 |
| Utility | Licking Rural Electric INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon Web Services CMH56 use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
What chips does Amazon Web Services CMH56 use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How close is Amazon Web Services CMH56 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Smith's Mill Substation (138 kV), about 200 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.
How clean is the power for Amazon Web Services CMH56?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Amazon Web Services CMH56?
Amazon Web Services.
Data centers near New Albany
- Amazon Web Services Datacenter Complex 366 m · 21 MW
- Vantage Building 3 478 m · 41 MW
- Vantage OH1 Data Center Campus 692 m · 30 MW
- Amazon New Albany: Jug and Beach Road 722 m · 50 MW
- Amazon Web Services 1.7 km · 24 MW
- Amazon New Albany: Innovation Campus Way 1.9 km · 38 MW
- Amazon Web Services 2.1 km · 23 MW
- AWS New Albany 2.4 km · 255 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.