Vantage OH1 Data Center Campus
Vantage OH1 Data Center Campus is an operational data center operated by Vantage in New Albany, United States. Our footprint estimate of its power is about 30 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vantage |
| Facility power | 30 MW (range 12 MW to 75 MW) Estimate from building footprint, low confidence. Footprint estimate: about 250,713 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Vantage Building 1 · Vantage Building 2 |
| Opened | 2024-10-01 |
| Coordinates | 40.10139, -82.74696 |
| Website | vantage-dc.com/data-center-locations/north-america/new-albany-ohio |
Power and grid
| Nearest high-voltage substation | Badger Substation, 138 kV, 300 m away (American Electric Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Jug Street Substation, 345 kV, 600 m away |
| HV substations within 10 km | 23 |
| Utility | Licking Rural Electric INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 2.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 532 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage OH1 Data Center Campus use?
We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.
How close is Vantage OH1 Data Center Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Badger Substation (138 kV), about 300 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.
How clean is the power for Vantage OH1 Data Center Campus?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Vantage OH1 Data Center Campus?
Vantage.
Data centers near New Albany
- Vantage Building 3 293 m · 41 MW
- Amazon New Albany: Jug and Beach Road 403 m · 50 MW
- Amazon Web Services CMH56 692 m · 16 MW
- Amazon Web Services Datacenter Complex 892 m · 21 MW
- Amazon Web Services 1.4 km · 24 MW
- Amazon New Albany: Innovation Campus Way 1.7 km · 38 MW
- AWS New Albany 1.7 km · 255 MW
- Amazon Web Services 1.9 km · 23 MW
More Vantage data centers
- Vantage Building 3 United States
- Vantage Quincy Campus United States
- Vantage data center in Santa Clara United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.