Amazon Web Services Datacenter Complex
Amazon Web Services Datacenter Complex is an operational data center operated by Amazon Web Services in New Albany, United States. Our footprint estimate of its power is about 21 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 21 MW (range 8.6 MW to 54 MW) Estimate from building footprint, low confidence. Footprint estimate: about 178,575 m² site outline x 0.12 kW per m² of land. |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Amazon Web Services CMH59 · Amazon Web Services CMH50 · Amazon Web Services CMH53 · Amazon Web Services CMH62 |
| Coordinates | 40.09369, -82.74990 |
Power and grid
| Utility | Licking Rural Electric INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 532 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon Web Services Datacenter Complex use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
What chips does Amazon Web Services Datacenter Complex use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How clean is the power for Amazon Web Services Datacenter Complex?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Amazon Web Services Datacenter Complex?
Amazon Web Services.
Data centers near New Albany
- Amazon Web Services CMH56 366 m · 16 MW
- Vantage Building 3 608 m · 41 MW
- Vantage OH1 Data Center Campus 892 m · 30 MW
- Amazon New Albany: Jug and Beach Road 1.0 km · 50 MW
- Amazon Web Services 1.5 km · 24 MW
- Amazon New Albany: Innovation Campus Way 1.7 km · 38 MW
- Amazon Web Services 1.9 km · 23 MW
- AWS New Albany 2.6 km · 255 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.